Cameron LNG Facility
Ownership and Operation:
- Wholly owned subsidiary of Sempra Energy (SRE)
- The detailed ownership distribution with relevance to Cameron natural gas is:
- Sempra LNG: 50.2%
- Mitsui Group: 16.6%
- TotalEnergies: 16.6%
- Mitsubishi Corporation: 11.62%
- NYK: 4.98%
(Note: Japan LNG Investment, a joint venture between Mitsubishi Corporation [70%] and NYK [30%], holds 16.6% of Cameron LNG LLC.)
Location:
- GPS Coordinates: 30.035471,-93.3383568
- State: Louisiana
- Parish: Hackberry
Feeder Pipelines:
- Pipelines: Columbia Gulf, Cameron Interstate
Capacity and Details:
Overall Export Capacity: 12 Mtpa / 1.7 Bcf/d
Export Terminal Phase 1 Train 1:
- Capacity: 4.5 Mtpa
- Status: Operating
- Start Year: 2019
Export Terminal Phase 1 Train 2:
- Capacity: 4.5 Mtpa
- Status: Operating
- Start Year: 2020
Export Terminal Phase 1 Train 3:
- Capacity: 4.5 Mtpa
- Status: Operating
- Start Year: 2020
Export Terminal Phase 2 Train 4:
- Capacity: Initially proposed 5 Mtpa, now 6.75 mtpa
- Status: Proposed, pre-FID
- Expected Start Year: 2026
Export Terminal Phase 2 Train 5:
- Capacity: 5 Mtpa
- Status: Cancelled
- Expected Start Year: 2026
Import Terminal:
- Capacity: 11.3 Mtpa, 1.65 bcfd
- Status: Mothballed
- Start Year: 2009
As of 08/23