Driftwood LNG Facility
Ownership and Operation:
- Owner: Driftwood LNG LLC
- Operator: Driftwood LNG LLC
- Parent Company: Tellurian Inc.
Location:
- GPS Coordinates: 30.091298, -93.330534
- State: Louisiana
- Parish: Calcasieu
Feeder Pipelines:
- Pipelines: Driftwood LNG Pipeline (Proposed)
Capacity and Details:
Overall Export Capacity: 11 Mtpa / 1.5 Bcf/d
Export Facility Plans (Proposed):
- Trains: 20, to be constructed in five stages related to the Driftwood LNG project
- Status: Currently under consideration, awaiting Final Investment Decision (FID).
- Initiation: Expected to begin in 2024, aiming for the complete operationality of the Driftwood LNG project by 2026 or 2027
As of 08/23