Resource
Golden Pass LNG Facility
Ownership and Operation:
- Owned by a consortium led by Qatar Petroleum (70%) and ExxonMobil (30%)
Location:
- GPS Coordinates: 29.761394, -93.919418
- State: Texas
- County: Sabine Pass
Feeder Pipelines:
- Pipelines: Golden Pass
Capacity and Details:
Overall Export Capacity: 18 Mtpa / 2.6 Bcf/d
Export Project Details – Train 1:
- Owner: Golden Pass LNG Terminal LLC
- Operator: Golden Pass Products
- Capacity: 6.03 Mtpa (Previously: 5.2 Mtpa)
- Status: Construction
- Cost: US$10 billion (total cost of Trains 1-3)
- Start Year: 2024
Export Terminal Phase 1 Train 2:
- (Details same as Train 1 with Start year: 2024)
Export Terminal Phase 1 Train 2:
- (Details same as Train 1 with Start year: 2024)
Import Terminal:
- Owner: Golden Pass LNG Terminal
- Parent: Qatar Petroleum (70%), ExxonMobil (30%)
- Capacity: 15.7 Mtpa
- Status: Mothballed
- Start Year: 2011
As of 08/23