Resource
Port Arthur LNG Facility
Ownership and Operation:
- Owner: Port Arthur LNG, LLC; PALNG Common Facilities Company, LLC
- Operator: Sempra Energy [70%], ConocoPhillips [30%]
- Parent: Sempra Energy
- Cost: US$10.5 billion
- Financing: JPMorgan Chase (Financial Advisor)
Location:
- GPS Coordinates: 29.81166342, -93.95962882
- State: Texas
- County: Port Arthur
Feeder Pipelines:
- Pipelines: None constructed as yet
Capacity and Details:
Overall Export Capacity: 13.5 Mtpa / 1.9 Bcf/d
Phase I Export Facility Details (Proposed):
- Status: Proposed, Pre-FID
- Trains: 2
- Start Year: Expected 2023
Phase II Export Facility Details (Proposed):
- Status: Proposed, Pre-FID
- Trains: 2
- Start Year: Expected 2023
* As of July 2022, ConocoPhillips owns a 30% stake in Phase I, and Sempra Energy owns the remaining 70%. This ownership ratio is presumed to be true for the two LLCs that own Phase I. Additionally, because ConocoPhillips owns a 30% stake in Phase I, it is presumed to be a parent company in the proposed Phase II.
As of 08/23