Resource

Port Arthur LNG Facility

portarthur-scaled

Ownership and Operation:

  • Owner: Port Arthur LNG, LLC; PALNG Common Facilities Company, LLC
  • Operator: Sempra Energy [70%], ConocoPhillips [30%]
  • Parent: Sempra Energy
  • Cost: US$10.5 billion
  • Financing: JPMorgan Chase (Financial Advisor)

Location:

  • GPS Coordinates: 29.81166342, -93.95962882
  • State: Texas
  • County: Port Arthur

Feeder Pipelines:

  • Pipelines: None constructed as yet

Capacity and Details:

Overall Export Capacity: 13.5 Mtpa / 1.9 Bcf/d

Phase I Export Facility Details (Proposed):

  • Status: Proposed, Pre-FID
  • Trains: 2
  • Start Year: Expected 2023

Phase II Export Facility Details (Proposed):

  • Status: Proposed, Pre-FID
  • Trains: 2
  • Start Year: Expected 2023

* As of July 2022, ConocoPhillips owns a 30% stake in Phase I, and Sempra Energy owns the remaining 70%. This ownership ratio is presumed to be true for the two LLCs that own Phase I. Additionally, because ConocoPhillips owns a 30% stake in Phase I, it is presumed to be a parent company in the proposed Phase II.

As of 08/23